Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:country |
gptkb:India
|
| gptkbp:length |
66 km (proposed)
|
| gptkbp:line |
3 (proposed)
|
| gptkbp:location |
gptkb:Amaravati
|
| gptkbp:plannedCity |
gptkb:Amaravati
|
| gptkbp:proposedBy |
Andhra Pradesh Metro Rail Corporation
|
| gptkbp:serves |
gptkb:Amaravati
gptkb:Guntur gptkb:Vijayawada |
| gptkbp:state |
gptkb:Andhra_Pradesh
|
| gptkbp:status |
proposed
on hold |
| gptkbp:type |
rapid transit
|
| gptkbp:yearProposed |
2015
|
| gptkbp:bfsParent |
gptkb:Vijayawada_Metro_(proposed)
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Amaravati Metro (proposed)
|