Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
pipeline
|
gptkbp:alsoKnownAs |
Trans-Saharan Gas Pipeline
|
gptkbp:endPoint |
gptkb:Hassi_R'Mel,_Algeria
|
gptkbp:estimatedCost |
over $10 billion
|
https://www.w3.org/2000/01/rdf-schema#label |
Algeria (to Nigeria)
|
gptkbp:involvedCountry |
gptkb:Algeria
gptkb:Niger gptkb:Nigeria |
gptkbp:length |
over 4,000 km
|
gptkbp:partner |
gptkb:Nigerian_National_Petroleum_Corporation
gptkb:Sonatrach Société Nigérienne du Pétrole |
gptkbp:plannedRoute |
Nigeria, Niger, Algeria
|
gptkbp:potentialMarkets |
gptkb:Europe
|
gptkbp:proposedBy |
2002
|
gptkbp:purpose |
transport natural gas from Nigeria to Algeria
|
gptkbp:startPoint |
gptkb:Warri,_Nigeria
|
gptkbp:status |
proposed
|
gptkbp:bfsParent |
gptkb:Nigerian_Civil_War_(Biafra)
|
gptkbp:bfsLayer |
7
|