Advanced Planning and Scheduling
GPTKB entity
Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:software
|
| gptkbp:abbreviation |
gptkb:APS
|
| gptkbp:benefit |
cost reduction
improved on-time delivery increased efficiency |
| gptkbp:developedBy |
1990s
|
| gptkbp:feature |
integration with ERP
real-time scheduling capacity planning constraint-based planning demand forecasting finite scheduling material requirements planning multi-site planning order promising what-if analysis |
| gptkbp:purpose |
improve resource allocation
optimize production scheduling reduce lead times |
| gptkbp:relatedTo |
gptkb:Enterprise_Resource_Planning
gptkb:Manufacturing_Execution_System |
| gptkbp:replacedBy |
traditional production planning
|
| gptkbp:usedIn |
manufacturing
supply chain management |
| gptkbp:bfsParent |
gptkb:APS
|
| gptkbp:bfsLayer |
5
|
| https://www.w3.org/2000/01/rdf-schema#label |
Advanced Planning and Scheduling
|