Statements (56)
Predicate | Object |
---|---|
gptkbp:instanceOf |
tunnel
|
gptkbp:aroma |
yes
|
gptkbp:built |
2007-2011
4 years groundwater management |
gptkbp:communityEngagement |
public consultations
|
gptkbp:connects |
Guildford_and_Portsmouth
|
gptkbp:constructionMaterial |
reinforced concrete
cut and cover £371 million |
gptkbp:constructionStarted |
2007
|
gptkbp:design |
won several
acoustic barriers |
gptkbp:designedBy |
gptkb:Highways_Agency
|
gptkbp:emergencyServices |
yes
improved conducted regularly |
gptkbp:environmentalImpact |
wildlife corridors
reduced air pollution |
gptkbp:explores |
natural and mechanical
compliant_with_UK_regulations |
gptkbp:features |
twin_bore
|
gptkbp:fledgingPeriod |
in place
|
gptkbp:futurePlans |
monitoring traffic flow
|
gptkbp:gameLength |
4.8 meters
|
gptkbp:geologicalFeatures |
chalk and clay
|
https://www.w3.org/2000/01/rdf-schema#label |
A3 Hindhead Tunnel
|
gptkbp:land_use |
completed before construction
|
gptkbp:landmark |
yes
|
gptkbp:length |
1.14 miles
|
gptkbp:lighting |
LED lights
|
gptkbp:localEconomy |
positive
|
gptkbp:localTraditions |
received funding for local projects
|
gptkbp:location |
Hindhead,_Surrey,_England
|
gptkbp:maintenance |
gptkb:Highways_England
|
gptkbp:netIncome |
yes
conducted regularly |
gptkbp:opened |
2011
|
gptkbp:openedIn |
Queen Elizabeth II
|
gptkbp:originalNetwork |
part of strategic road network
|
gptkbp:partOf |
A3 road
|
gptkbp:passenger_traffic |
motor vehicles
approximately 40,000 vehicles per day reduced |
gptkbp:project |
gptkb:Balfour_Beatty
|
gptkbp:publicAccess |
generally positive
|
gptkbp:publicTransport |
limited
|
gptkbp:rootSystem |
8.5 meters
1.14 miles |
gptkbp:safetyFeatures |
fire suppression system
|
gptkbp:significance |
reduces congestion
|
gptkbp:surroundingArea |
National_Trust_land
|
gptkbp:toll |
no
|
gptkbp:touristAttraction |
yes
|
gptkbp:vehicleClass |
improved
|
gptkbp:width |
7.3 meters
|