Statements (19)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:capacity |
1098 MW
|
| gptkbp:commissioned |
1956
|
| gptkbp:country |
gptkb:Slovenia
|
| gptkbp:emissionStandard |
CO2
|
| gptkbp:fuelType |
lignite
|
| gptkbp:gridConnection |
gptkb:Slovenian_national_grid
|
| gptkbp:location |
gptkb:Šoštanj
|
| gptkbp:notableUnit |
Unit 6
|
| gptkbp:numberOfRooms |
6
|
| gptkbp:operator |
gptkb:Termoelektrarna_Šoštanj_d.o.o.
|
| gptkbp:owner |
gptkb:Holding_Slovenske_elektrarne
|
| gptkbp:status |
operational
|
| gptkbp:Unit_6_capacity |
600 MW
|
| gptkbp:Unit_6_commissioned |
2015
|
| gptkbp:website |
https://www.te-sostanj.si/
|
| gptkbp:bfsParent |
gptkb:Velenje_Lake
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Šoštanj Thermal Power Plant
|