Triple

T9991507
Position Surface form Disambiguated ID Type / Status
Subject Dong Xuan Market E196895 entity
Predicate near P350 FINISHED
Object Long Bien Bridge E787324 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Long Bien Bridge | Statement: [Dong Xuan Market, near, Long Bien Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Long Bien Bridge
Context triple: [Dong Xuan Market, near, Long Bien Bridge]
  • A. Long Bien Bridge chosen
    Long Bien Bridge is a historic cantilever bridge in Hanoi, Vietnam, famed for its French colonial-era construction and its resilience through multiple wars.
  • B. Thu Thiem Bridge
    Thu Thiem Bridge is a major road bridge in Ho Chi Minh City, Vietnam, connecting the city center with the Thu Thiem urban area in District 2.
  • C. Can Tho Bridge
    Can Tho Bridge is a major cable-stayed bridge in southern Vietnam that spans the Hau River, significantly improving transportation links in the Mekong Delta region.
  • D. Tran Thi Ly Bridge
    Tran Thi Ly Bridge is a modern, cable-stayed bridge in Da Nang, Vietnam, known for its distinctive leaning pylon and striking nighttime illumination.
  • E. Thuan Phuoc Bridge
    Thuan Phuoc Bridge is a large modern suspension bridge in Da Nang, Vietnam, known for spanning the Han River near its mouth and serving as a prominent city landmark.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f1678c819093d06320a05f16a4 completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cdcb95842c8190b8cdce9584f19840 completed April 2, 2026, 1:51 a.m.
NED1 Entity disambiguation (via context triple) batch_69d25821dde881909f5d4cc6ad048b01 completed April 5, 2026, 12:40 p.m.
Created at: March 30, 2026, 8:50 p.m.