Triple
T9956472
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Colosseo metro station |
E195458
|
entity |
| Predicate | operator |
P179
|
FINISHED |
| Object |
ATAC
ATAC is the public transport company responsible for managing and operating much of Rome’s urban transit network, including buses, trams, and metro services.
|
E831886
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ATAC | Statement: [Colosseo metro station, operator, ATAC]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ATAC Context triple: [Colosseo metro station, operator, ATAC]
-
A.
AGAT
AGAT is a Polish special forces unit known for high-risk direct action, counterterrorism, and rapid response operations.
-
B.
ATAS
ATAS is the commonly used acronym for the Academy of Television Arts & Sciences, the organization best known for administering the Primetime Emmy Awards.
-
C.
GATA
GATA is a song featured on the album "TattleTales" by rapper 6ix9ine.
-
D.
ETAC
ETAC is the Engineering Technology Accreditation Commission of ABET, responsible for accrediting engineering technology degree programs worldwide.
-
E.
ATEC
ATEC is a U.S. Army command responsible for testing and evaluating military equipment, systems, and technologies to ensure they are effective and reliable for operational use.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: ATAC Triple: [Colosseo metro station, operator, ATAC]
Generated description
ATAC is the public transport company responsible for managing and operating much of Rome’s urban transit network, including buses, trams, and metro services.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: ATAC Target entity description: ATAC is the public transport company responsible for managing and operating much of Rome’s urban transit network, including buses, trams, and metro services.
-
A.
AGAT
AGAT is a Polish special forces unit known for high-risk direct action, counterterrorism, and rapid response operations.
-
B.
ATAS
ATAS is the commonly used acronym for the Academy of Television Arts & Sciences, the organization best known for administering the Primetime Emmy Awards.
-
C.
GATA
GATA is a song featured on the album "TattleTales" by rapper 6ix9ine.
-
D.
ETAC
ETAC is the Engineering Technology Accreditation Commission of ABET, responsible for accrediting engineering technology degree programs worldwide.
-
E.
ATEC
ATEC is a U.S. Army command responsible for testing and evaluating military equipment, systems, and technologies to ensure they are effective and reliable for operational use.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82eaaa008190a54fa1a9f954b9ad |
completed | March 30, 2026, 2:04 p.m. |
| NER | Named-entity recognition | batch_69cdb6976b50819097a0ae347354e92c |
completed | April 2, 2026, 12:21 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d23d71342081908084c27790ef4fcc |
completed | April 5, 2026, 10:46 a.m. |
| NEDg | Description generation | batch_69d23fb02c6081909f2c99ca21c90822 |
completed | April 5, 2026, 10:55 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d24047ae4081909678ca9cf6cfbfff |
completed | April 5, 2026, 10:58 a.m. |
Created at: March 30, 2026, 8:46 p.m.