Triple
T9942388
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amtrak Thruway Motorcoach |
E194114
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | intercity bus service network |
C11790
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: intercity bus service network Context triple: [Amtrak Thruway Motorcoach, instanceOf, intercity bus service network]
-
A.
intercity coach service
chosen
An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
-
B.
ferry service network
A ferry service network is a coordinated system of water-based transport routes, vessels, terminals, and schedules that moves passengers and cargo between multiple ports or coastal locations.
-
C.
railway line service pattern
A railway line service pattern defines the structured arrangement of train services over a route, including stopping sequences, frequencies, and service types that determine how trains operate along the line.
-
D.
city network
A city network is an interconnected system of urban areas linked by transportation, communication, and economic relationships that facilitate the flow of people, goods, information, and services.
-
E.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82e409348190a393777356b80a2a |
completed | March 30, 2026, 2:04 p.m. |
Created at: March 30, 2026, 8:45 p.m.