Triple

T99370
Position Surface form Disambiguated ID Type / Status
Subject Energy Reorganization Act of 1974 E2005 entity
Predicate transferredFunctionsFrom P4781 FINISHED
Object Atomic Energy Commission E1263 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atomic Energy Commission | Statement: [Energy Reorganization Act of 1974, transferredFunctionsFrom, Atomic Energy Commission]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atomic Energy Commission
Context triple: [Energy Reorganization Act of 1974, transferredFunctionsFrom, Atomic Energy Commission]
  • A. United States Atomic Energy Commission chosen
    The United States Atomic Energy Commission was the federal agency that oversaw and regulated the development, production, and civilian use of nuclear energy and weapons in the United States during the early Cold War era.
  • B. International Atomic Energy Agency
    The International Atomic Energy Agency is a United Nations-affiliated organization that promotes the peaceful use of nuclear energy and works to prevent its use for military purposes through international safeguards and inspections.
  • C. U.S. Nuclear Regulatory Commission
    The U.S. Nuclear Regulatory Commission is the federal agency responsible for overseeing and ensuring the safe use of nuclear materials and facilities in the United States.
  • D. S-1 Uranium Committee
    The S-1 Uranium Committee was a U.S. government scientific advisory group that coordinated early research into nuclear fission and atomic weapons, laying the groundwork for what became the Manhattan Project.
  • E. National Security Resources Board
    The National Security Resources Board was a U.S. government body responsible for planning and coordinating the mobilization of the nation’s industrial and civilian resources for national defense during the early Cold War era.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: transferredFunctionsFrom
Context triple: [Energy Reorganization Act of 1974, transferredFunctionsFrom, Atomic Energy Commission]
  • A. separatedFunctionFrom
    Indicates that one entity has been detached or removed from performing a particular function or role in relation to another entity.
  • B. relocatedFrom
    Indicates that an entity has moved or been transferred away from a specified original location.
  • C. derivedFrom
    Indicates that one entity originates, is obtained, or is developed from another source entity.
  • D. relocatedTo
    Indicates that an entity has moved or been transferred from its previous location to a new specified location.
  • E. convertsFrom
    Indicates that one entity is transformed or changed into another entity, with the source being the starting form or state.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24d4862f881908cc8b89d3a78031d completed Feb. 28, 2026, 2:04 a.m.
NER Named-entity recognition batch_69a253b95d4c81909d1f2bc37e799c44 completed Feb. 28, 2026, 2:32 a.m.
NED1 Entity disambiguation (via context triple) batch_69a29820a4948190aea1d566cc3738ac completed Feb. 28, 2026, 7:24 a.m.
PD Predicate disambiguation batch_69a24ebfc5a88190bdd1653b9fa541fe completed Feb. 28, 2026, 2:11 a.m.
PDg Predicate description generation batch_69a253b869448190bd75a3542806b36c completed Feb. 28, 2026, 2:32 a.m.
Created at: Feb. 28, 2026, 2:09 a.m.