Triple

T9917023
Position Surface form Disambiguated ID Type / Status
Subject Wenchang Space Launch Site E185894 entity
Predicate launches P11671 FINISHED
Object Long March 7 E722359 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Long March 7 | Statement: [Wenchang Space Launch Site, launches, Long March 7]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Long March 7
Context triple: [Wenchang Space Launch Site, launches, Long March 7]
  • A. Long March 7 chosen
    Long March 7 is a Chinese medium-lift launch vehicle designed primarily to deliver cargo spacecraft and components for China’s crewed space program into orbit.
  • B. Long March 5
    Long March 5 is a heavy-lift Chinese orbital launch vehicle developed by the China National Space Administration for deploying large payloads to Earth orbit and deep-space missions.
  • C. Long March 6
    Long March 6 is a Chinese small-lift orbital launch vehicle designed for rapid, cost-effective deployment of satellites into low Earth orbit.
  • D. Long March 5B
    Long March 5B is a heavy-lift Chinese orbital launch vehicle primarily used to carry large modules and payloads for the country’s space station program.
  • E. Long March 4C
    Long March 4C is a Chinese three-stage orbital launch vehicle used primarily to place satellites into sun-synchronous and low Earth orbits.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca829b45f481909040f7b99a1976ed completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cdb540195881908f25f7dde5c66a75 completed April 2, 2026, 12:16 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2e531dfa48190b57fcd2444de1ab7 completed April 5, 2026, 10:41 p.m.
Created at: March 30, 2026, 8:42 p.m.