Triple
T9837390
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Taurus–Littrow valley |
E239137
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Apollo landing site |
C12603
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Apollo landing site Context triple: [Taurus–Littrow valley, instanceOf, Apollo landing site]
-
A.
lunar landing mission
A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
-
B.
NASA spaceport
A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
-
C.
lunar surface feature
chosen
A lunar surface feature is any distinct physical formation or characteristic on the Moon’s exterior, such as craters, maria, mountains, rilles, or valleys, identifiable by its shape, size, and location.
-
D.
lunar exploration program
A lunar exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study, visit, and potentially utilize the Moon’s environment and resources.
-
E.
Apollo Lunar Module
The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84e314108190978324a4bdb959f8 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:33 p.m.