Triple

T9833804
Position Surface form Disambiguated ID Type / Status
Subject Research Triangle Expressway E239050 entity
Predicate connectsTo P845 FINISHED
Object US 1 E378377 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 1 | Statement: [Research Triangle Expressway, connectsTo, US 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: US 1
Context triple: [Research Triangle Expressway, connectsTo, US 1]
  • A. US 1 chosen
    US 1 is a major north–south U.S. highway running along the East Coast, serving as a key route through numerous states and cities from Florida to Maine.
  • B. US 7
    US 7 is a north–south U.S. highway in New England that runs from Connecticut through Massachusetts to Vermont, serving as a major regional route.
  • C. US 1/9
    US 1/9 is a concurrent section of U.S. Routes 1 and 9 that runs through northern New Jersey, serving as a major urban arterial and connector to routes into New York City.
  • D. US 1A
    US 1A is a series of alternate U.S. Highway 1 routes in Maine that serve as business loops and local connectors through coastal towns and cities.
  • E. US-10
    US-10 is a major east–west U.S. Highway in the northern Midwest that runs through states including Michigan and Wisconsin, serving as an important regional transportation corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e314108190978324a4bdb959f8 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdb3385054819094145c96204e3f0d completed April 2, 2026, 12:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69d1d5c448388190818e4cc5e3a42dfc completed April 5, 2026, 3:23 a.m.
Created at: March 30, 2026, 8:32 p.m.