Triple
T9827992
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Åna-Sira |
E238706
|
entity |
| Predicate | hasNearbyHydropowerFacility |
P15311
|
FINISHED |
| Object |
Sira-Kvina hydropower system
The Sira-Kvina hydropower system is a major Norwegian hydroelectric power complex that harnesses the Sira and Kvina river systems through multiple dams, reservoirs, and power stations to generate renewable energy.
|
E823882
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sira-Kvina hydropower system | Statement: [Åna-Sira, hasNearbyHydropowerFacility, Sira-Kvina hydropower system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Sira-Kvina hydropower system Context triple: [Åna-Sira, hasNearbyHydropowerFacility, Sira-Kvina hydropower system]
-
A.
Lule River hydropower system
The Lule River hydropower system is a major network of dams, reservoirs, and power stations in northern Sweden that harnesses the Lule River’s flow to generate a significant share of the country’s hydroelectric power.
-
B.
Kurpsai Hydroelectric Power Plant
Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
-
C.
Almatti Hydroelectric Power Station
Almatti Hydroelectric Power Station is a major dam-based power facility in Karnataka, India, that generates electricity from the waters of the Krishna River.
-
D.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
-
E.
Kotmale Hydroelectric Power Station
Kotmale Hydroelectric Power Station is a major Sri Lankan hydroelectric facility that harnesses the waters of the Mahaweli River to generate electricity as part of the country's largest river basin development scheme.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Sira-Kvina hydropower system Triple: [Åna-Sira, hasNearbyHydropowerFacility, Sira-Kvina hydropower system]
Generated description
The Sira-Kvina hydropower system is a major Norwegian hydroelectric power complex that harnesses the Sira and Kvina river systems through multiple dams, reservoirs, and power stations to generate renewable energy.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Sira-Kvina hydropower system Target entity description: The Sira-Kvina hydropower system is a major Norwegian hydroelectric power complex that harnesses the Sira and Kvina river systems through multiple dams, reservoirs, and power stations to generate renewable energy.
-
A.
Lule River hydropower system
The Lule River hydropower system is a major network of dams, reservoirs, and power stations in northern Sweden that harnesses the Lule River’s flow to generate a significant share of the country’s hydroelectric power.
-
B.
Kurpsai Hydroelectric Power Plant
Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
-
C.
Almatti Hydroelectric Power Station
Almatti Hydroelectric Power Station is a major dam-based power facility in Karnataka, India, that generates electricity from the waters of the Krishna River.
-
D.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
-
E.
Kotmale Hydroelectric Power Station
Kotmale Hydroelectric Power Station is a major Sri Lankan hydroelectric facility that harnesses the waters of the Mahaweli River to generate electricity as part of the country's largest river basin development scheme.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasNearbyHydropowerFacility Context triple: [Åna-Sira, hasNearbyHydropowerFacility, Sira-Kvina hydropower system]
-
A.
hasHydroelectricProject
chosen
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
B.
isHydroelectricProjectOn
Indicates that a hydroelectric project is located on or situated along a specified water body or site.
-
C.
hydropowerPotential
Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
-
D.
hasNearbyWater
Indicates that one entity is located close to a body of water associated with or relevant to another entity.
-
E.
hasNearbyWatersUsedBy
Indicates that a body of water located near an entity is utilized or accessed by another specified entity.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84e0dd1881909800765d1e21f735 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cdb3268fcc8190b7a028f224512e5f |
completed | April 2, 2026, 12:07 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d1cc8ca2808190a1da0641162f12d1 |
completed | April 5, 2026, 2:44 a.m. |
| NEDg | Description generation | batch_69d1cf8c89f481908dcc9c430d9e45a2 |
completed | April 5, 2026, 2:57 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d1d01f546881909e65789ed2895825 |
completed | April 5, 2026, 2:59 a.m. |
| PD | Predicate disambiguation | batch_69cd03e30bc08190816c0a6d29c21b0f |
completed | April 1, 2026, 11:39 a.m. |
Created at: March 30, 2026, 8:32 p.m.