Triple

T9806027
Position Surface form Disambiguated ID Type / Status
Subject Uji E237955 entity
Predicate transportConnection P1298 FINISHED
Object JR Nara Line E648125 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: JR Nara Line | Statement: [Uji, transportConnection, JR Nara Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: JR Nara Line
Context triple: [Uji, transportConnection, JR Nara Line]
  • A. JR Wakayama Line
    The JR Wakayama Line is a regional railway line in Japan operated by JR West that connects Nara Prefecture with Wakayama Prefecture.
  • B. Kintetsu Nara Line
    The Kintetsu Nara Line is a major private railway line in Japan connecting Osaka with the historic city of Nara, serving commuters and tourists across the Kansai region.
  • C. JR West Nara Line chosen
    The JR West Nara Line is a railway line in Japan operated by West Japan Railway Company that connects the Kyoto area with Nara, serving various cities and towns in between.
  • D. JR Takarazuka Line
    The JR Takarazuka Line is a major West Japan Railway Company (JR West) commuter and intercity rail route in the Osaka–Hyōgo area, connecting central Osaka with Takarazuka and beyond.
  • E. Nara Line
    The Nara Line is a railway line in Japan operated by JR West that connects the historic cities of Kyoto and Nara.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84dd4608819097ff4ed00feca280 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdab7b67748190ba16ce868f29d13e completed April 1, 2026, 11:34 p.m.
NED1 Entity disambiguation (via context triple) batch_69e4cbacad608190adddd91f13e4113b completed April 19, 2026, 12:33 p.m.
Created at: March 30, 2026, 8:29 p.m.