Triple

T97696
Position Surface form Disambiguated ID Type / Status
Subject IND Division E1968 entity
Predicate instanceOf P0 FINISHED
Object historical transit operating division C1889 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: historical transit operating division
Context triple: [IND Division, instanceOf, historical transit operating division]
  • A. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • B. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • C. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. historic transportation system
    A historic transportation system is an organized network of vehicles, routes, and infrastructure from a past era that once facilitated the movement of people or goods and is now preserved, studied, or remembered for its cultural, technological, or historical significance.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24d4862f881908cc8b89d3a78031d completed Feb. 28, 2026, 2:04 a.m.
Created at: Feb. 28, 2026, 2:09 a.m.