Triple

T9768250
Position Surface form Disambiguated ID Type / Status
Subject Shibpur E237052 entity
Predicate hasRoad P959 FINISHED
Object Andul Road E733734 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Andul Road | Statement: [Shibpur, hasRoad, Andul Road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Andul Road
Context triple: [Shibpur, hasRoad, Andul Road]
  • A. Andul Road chosen
    Andul Road is a major thoroughfare in Howrah, West Bengal, that serves as an important connector between localities such as Santragachi and the wider Kolkata metropolitan area.
  • B. Ghodbunder Road
    Ghodbunder Road is a major arterial roadway in Thane, Maharashtra, that links the Eastern and Western Express Highways and serves as a key corridor for regional traffic and urban development.
  • C. Julu Road
    Julu Road is a historic, tree-lined street in Shanghai known for its blend of old lane houses, trendy cafes, and boutiques in the former French Concession area.
  • D. Pir Sohawa Road
    Pir Sohawa Road is a scenic mountain roadway near Islamabad, Pakistan, that winds through the Margalla Hills to connect the city with the hilltop resort area of Pir Sohawa.
  • E. Iponri Road
    Iponri Road is a significant thoroughfare in the Surulere area of Lagos, Nigeria, serving as an important connector within the neighborhood’s road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84d831b8819090322686b47887ce completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cda0a2da648190836916a45d2998d7 completed April 1, 2026, 10:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69d1cc46f170819081ecc5e85a0514c3 completed April 5, 2026, 2:43 a.m.
Created at: March 30, 2026, 8:25 p.m.