Triple
T9756893
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Unit 1 |
E236575
|
entity |
| Predicate | isOnlyUnitOf |
P90827
|
FINISHED |
| Object | Hope Creek Nuclear Generating Station |
E46443
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hope Creek Nuclear Generating Station | Statement: [Unit 1, isOnlyUnitOf, Hope Creek Nuclear Generating Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hope Creek Nuclear Generating Station Context triple: [Unit 1, isOnlyUnitOf, Hope Creek Nuclear Generating Station]
-
A.
Hope Creek Nuclear Generating Station
chosen
Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
-
B.
Pickering Nuclear Generating Station
Pickering Nuclear Generating Station is a large Canadian nuclear power plant on the shore of Lake Ontario that has been a major source of electricity for the Greater Toronto Area.
-
C.
Darlington Nuclear Generating Station
Darlington Nuclear Generating Station is a major Canadian nuclear power plant in Ontario that produces electricity using CANDU reactors operated by Ontario Power Generation.
-
D.
Calvert Cliffs Nuclear Power Plant
Calvert Cliffs Nuclear Power Plant is a two-unit pressurized water nuclear power station on the western shore of the Chesapeake Bay that generates electricity for the Mid-Atlantic region.
-
E.
Salem Nuclear Power Plant
Salem Nuclear Power Plant is a commercial nuclear power station in Lower Alloways Creek Township, New Jersey, that generates electricity using pressurized water reactors along the Delaware River.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isOnlyUnitOf Context triple: [Unit 1, isOnlyUnitOf, Hope Creek Nuclear Generating Station]
-
A.
isAUnitOf
Indicates that one entity functions as a unit or standard measure in which the other entity is quantified or expressed.
-
B.
isInternalUnitOf
Indicates that one unit functions as a subordinate or component part within the organizational structure of another unit.
-
C.
isBaseUnitOf
Indicates that one unit serves as the fundamental reference unit from which another unit in the same measurement system is defined or derived.
-
D.
isUnitIn
Indicates that a specific unit is located within or belongs to a particular container, group, or context.
-
E.
hasUnitOf
Indicates that a quantity, measurement, or value is expressed in terms of a specific unit.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d64f6c8190a4ed4e9f5936eda5 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cd9fb2889481908fba4a449d5007fe |
completed | April 1, 2026, 10:44 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d23cd89d1c8190aedab60e3f5088b3 |
completed | April 5, 2026, 10:43 a.m. |
| PD | Predicate disambiguation | batch_69cd03d0772c8190bd1750cf1cfba309 |
completed | April 1, 2026, 11:38 a.m. |
| PDg | Predicate description generation | batch_69cd081a9c5c819093439be7e802ff85 |
completed | April 1, 2026, 11:57 a.m. |
Created at: March 30, 2026, 8:24 p.m.