Triple

T9729608
Position Surface form Disambiguated ID Type / Status
Subject Yenimahalle E235703 entity
Predicate hasPublicTransportConnection P3791 FINISHED
Object Ankara Metro E80644 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ankara Metro | Statement: [Yenimahalle, hasPublicTransportConnection, Ankara Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ankara Metro
Context triple: [Yenimahalle, hasPublicTransportConnection, Ankara Metro]
  • A. Ankara Metro chosen
    Ankara Metro is the rapid transit system serving Turkey's capital city, providing urban rail transportation across Ankara and its surrounding districts.
  • B. Istanbul Metro
    The Istanbul Metro is a rapid transit system serving Istanbul, Turkey, connecting key districts and transport hubs across the city.
  • C. Ankara commuter rail (Başkentray)
    Ankara commuter rail (Başkentray) is a suburban rail system serving the Ankara metropolitan area, providing frequent, high-capacity passenger service along key east–west corridors.
  • D. Izmir Metro
    Izmir Metro is a rapid transit rail system serving the city of Izmir, Turkey, providing high-capacity urban transportation across key districts.
  • E. Istanbul commuter rail network
    The Istanbul commuter rail network is a suburban rail system serving the greater Istanbul metropolitan area, integrating cross-Bosporus links and multiple lines to connect key residential and commercial districts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84d0fad481909cdd45aa77416c48 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cd9eb0ff488190ac32ed304a3cd3bc completed April 1, 2026, 10:39 p.m.
NED1 Entity disambiguation (via context triple) batch_69d19fb5f5bc8190ae53bc5c165b5ac7 completed April 4, 2026, 11:33 p.m.
Created at: March 30, 2026, 8:21 p.m.