Triple

T9715926
Position Surface form Disambiguated ID Type / Status
Subject E.ON E235141 entity
Predicate owns P347 FINISHED
Object E.ON Sverige E235141 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: E.ON Sverige | Statement: [E.ON, owns, E.ON Sverige]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: E.ON Sverige
Context triple: [E.ON, owns, E.ON Sverige]
  • A. E.ON chosen
    E.ON is a major European energy company based in Germany that focuses on electricity generation, renewable energy, and energy infrastructure services.
  • B. Vattenfall
    Vattenfall is a Swedish state-owned energy company that is one of Europe’s largest producers and distributors of electricity and heat, with a significant focus on renewable energy such as wind power.
  • C. Fortum
    Fortum is a Finnish state-owned energy company that focuses on electricity generation, district heating, and related energy services across the Nordic and Baltic regions, Poland, and India.
  • D. Ørsted
    Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
  • E. Hitachi Energy
    Hitachi Energy is a global technology company specializing in power grids and energy solutions, formed as a joint venture between Hitachi and ABB to support the transition to sustainable energy systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84cd8fa0819090a5e243ceb37003 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cd9e0bb82081908e21a646f4de1a61 completed April 1, 2026, 10:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69d19f941b908190a3e27f4b6c1b3535 completed April 4, 2026, 11:32 p.m.
Created at: March 30, 2026, 8:20 p.m.