Triple

T970562
Position Surface form Disambiguated ID Type / Status
Subject Gigafactory Shanghai E20934 entity
Predicate operator P179 FINISHED
Object Tesla, Inc. E3005 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tesla, Inc. | Statement: [Gigafactory Shanghai, operator, Tesla, Inc.]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tesla, Inc.
Context triple: [Gigafactory Shanghai, operator, Tesla, Inc.]
  • A. Tesla, Inc. chosen
    Tesla, Inc. is an American electric vehicle and clean energy company known for pioneering mass-market electric cars, advanced battery technology, and autonomous driving innovations.
  • B. Tesla
    Tesla is a renowned Serbian-American inventor, electrical engineer, and futurist best known for his pioneering work on alternating current (AC) power systems and numerous innovations in electromagnetism.
  • C. Tesla Semi
    The Tesla Semi is an all-electric Class 8 semi-truck designed to offer high efficiency, long range, and lower operating costs compared to traditional diesel trucks.
  • D. GE Vernova
    GE Vernova is General Electric’s energy-focused business, encompassing power generation, grid, and renewable energy technologies and services.
  • E. The Boring Company
    The Boring Company is an infrastructure and tunnel construction firm founded by Elon Musk to develop underground transportation systems aimed at reducing urban traffic congestion.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b33d2c81909c52c369d3ca8436 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b4497d688190b59c3a195e377080 completed March 1, 2026, 9:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac7f26d0548190a4d851e8758fd07e completed March 7, 2026, 7:40 p.m.
Created at: March 1, 2026, 7:40 p.m.