Triple

T970462
Position Surface form Disambiguated ID Type / Status
Subject Tesla Powerpack E20932 entity
Predicate instanceOf P0 FINISHED
Object lithium-ion battery system C4729 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lithium-ion battery system
Context triple: [Tesla Powerpack, instanceOf, lithium-ion battery system]
  • A. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • B. expendable launch system
    An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
  • C. fully reusable launch system
    A fully reusable launch system is a space launch architecture in which all major components (such as boosters, upper stages, and spacecraft) are recovered, refurbished, and flown again, minimizing expendable hardware and reducing per-launch costs.
  • D. liquid-cooled aircraft engine
    A liquid-cooled aircraft engine is a piston or reciprocating powerplant that uses a circulating liquid coolant, typically water or glycol, to absorb and dissipate heat from the engine cylinders and heads, enabling efficient temperature control and reliable operation in flight.
  • E. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b33d2c81909c52c369d3ca8436 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.