Triple
T970461
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tesla Powerpack |
E20932
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | battery energy storage system |
C4728
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: battery energy storage system Context triple: [Tesla Powerpack, instanceOf, battery energy storage system]
-
A.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
energy ministry
The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
-
C.
substation automation standard
A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
-
D.
expendable launch system
An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
-
E.
dual-purpose reactor
A dual-purpose reactor is a nuclear reactor designed to simultaneously produce electrical power and another output, such as process heat or weapons-grade materials.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493b33d2c81909c52c369d3ca8436 |
completed | March 1, 2026, 7:29 p.m. |
Created at: March 1, 2026, 7:40 p.m.