Triple
T970082
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oracle E-Business Suite |
E20925
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | SCM system |
C4727
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: SCM system Context triple: [Oracle E-Business Suite, instanceOf, SCM system]
-
A.
mission system
A mission system is a coordinated set of processes, tools, and resources designed to plan, execute, monitor, and evaluate the completion of specific operational or strategic objectives.
-
B.
socio-technical system
A socio-technical system is an interconnected arrangement of people, technologies, and organizational structures whose interactions jointly shape how work is performed and outcomes are produced.
-
C.
ACM program
An ACM program is a software application or system developed, evaluated, or used within the context of the Association for Computing Machinery’s computing, research, and educational activities.
-
D.
library cataloging tool
A library cataloging tool is a system that helps librarians and users organize, classify, and retrieve library materials efficiently through standardized metadata and search functions.
-
E.
public library system
A public library system is an organized network of libraries, resources, services, and policies that manages the acquisition, cataloging, circulation, and access to informational and cultural materials for a community.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493b33d2c81909c52c369d3ca8436 |
completed | March 1, 2026, 7:29 p.m. |
Created at: March 1, 2026, 7:40 p.m.