Triple

T9664805
Position Surface form Disambiguated ID Type / Status
Subject Cambrian Coast Line E233675 entity
Predicate crosses P416 FINISHED
Object Barmouth Bridge E273159 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barmouth Bridge | Statement: [Cambrian Coast Line, crosses, Barmouth Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Barmouth Bridge
Context triple: [Cambrian Coast Line, crosses, Barmouth Bridge]
  • A. Barmouth Bridge chosen
    Barmouth Bridge is a historic wooden viaduct carrying the railway across the Mawddach Estuary near Barmouth in Gwynedd, Wales.
  • B. Dyfi Bridge
    Dyfi Bridge is a historic stone road bridge in Wales that carries traffic across the River Dyfi near Machynlleth.
  • C. Briton Ferry Bridge
    Briton Ferry Bridge is a historic road bridge in South Wales that spans the River Neath, linking the town of Briton Ferry with Neath and the wider Neath Port Talbot area.
  • D. Pont-y-Pair Bridge
    Pont-y-Pair Bridge is a historic stone bridge and popular scenic viewpoint spanning the River Llugwy in the village of Betws-y-Coed in Snowdonia, Wales.
  • E. Carmarthen Bridge
    Carmarthen Bridge is a notable road bridge spanning the River Towy in the town of Carmarthen, Wales.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848d3b6c8190ae98ea554dea58df completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9c0e1ef481909c50a4ba5fd94583 completed April 1, 2026, 10:28 p.m.
NED1 Entity disambiguation (via context triple) batch_69d79445b9288190a684184285966fa8 completed April 9, 2026, 11:57 a.m.
Created at: March 30, 2026, 8:14 p.m.