Triple

T9620611
Position Surface form Disambiguated ID Type / Status
Subject Narmada Water Disputes Tribunal Award E232331 entity
Predicate setsConditionsForProject P56247 FINISHED
Object Sardar Sarovar Project E72857 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sardar Sarovar Project | Statement: [Narmada Water Disputes Tribunal Award, setsConditionsForProject, Sardar Sarovar Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sardar Sarovar Project
Context triple: [Narmada Water Disputes Tribunal Award, setsConditionsForProject, Sardar Sarovar Project]
  • A. Narmada Dam project
    The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
  • B. Bhakra Nangal Project
    The Bhakra Nangal Project is a major multipurpose river valley development scheme in India centered on the Bhakra and Nangal dams, providing irrigation, hydroelectric power, and flood control to northern states.
  • C. Sardar Sarovar Dam chosen
    Sardar Sarovar Dam is a large multipurpose concrete gravity dam on the Narmada River in western India, known for its major role in irrigation, drinking water supply, and hydroelectric power generation.
  • D. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • E. Malaprabha River Project
    The Malaprabha River Project is an irrigation and water management scheme in Karnataka, India, centered on harnessing the Malaprabha River through dams and reservoirs to support agriculture and regional development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: setsConditionsForProject
Context triple: [Narmada Water Disputes Tribunal Award, setsConditionsForProject, Sardar Sarovar Project]
  • A. definesConditionsFor chosen
    Indicates that one entity specifies or establishes the rules, requirements, or circumstances under which another entity is valid, applicable, or operates.
  • B. eligibleProject
    Indicates that a project satisfies the required conditions or criteria to qualify for a particular status, process, or benefit.
  • C. affectedByProject
    Indicates that an entity experiences an impact, change, or influence as a result of a specific project.
  • D. targetedCondition
    Indicates that an action, intervention, or entity is specifically directed toward affecting, treating, or addressing a particular condition.
  • E. eligibleProjectType
    Indicates that a project belongs to a category or type that qualifies it for a specific program, process, or benefit.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84867bb88190b4b57dd5a56d5691 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9ad3a8d88190b1414aa676d82f36 completed April 1, 2026, 10:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69d18225f9508190bde23b9d2a40bccc completed April 4, 2026, 9:27 p.m.
PD Predicate disambiguation batch_69ccd5aa1d2c8190a287bf1cf4a3037e completed April 1, 2026, 8:22 a.m.
Created at: March 30, 2026, 8:09 p.m.