Triple

T956967
Position Surface form Disambiguated ID Type / Status
Subject Tesla Powerwall E20645 entity
Predicate instanceOf P0 FINISHED
Object energy storage system C5177 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: energy storage system
Context triple: [Tesla Powerwall, instanceOf, energy storage system]
  • A. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • B. energy ministry
    The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
  • C. expendable launch system
    An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
  • D. dual-purpose reactor
    A dual-purpose reactor is a nuclear reactor designed to simultaneously produce electrical power and another output, such as process heat or weapons-grade materials.
  • E. substation automation standard
    A substation automation standard defines the protocols, architectures, and requirements that enable interoperable, secure, and automated monitoring, control, and protection of electrical substations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b21f2881908132dcf45dcd2f36 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.