Triple

T9560495
Position Surface form Disambiguated ID Type / Status
Subject Forney algorithm E230658 entity
Predicate instanceOf P0 FINISHED
Object error-correction algorithm C6819 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: error-correction algorithm
Context triple: [Forney algorithm, instanceOf, error-correction algorithm]
  • A. algorithm chosen
    An algorithm is a finite, well-defined sequence of computational steps or rules designed to solve a specific problem or perform a particular task.
  • B. coding theory pioneer
    A coding theory pioneer is an individual who develops foundational concepts, algorithms, or frameworks that advance the mathematical design and analysis of error-detecting and error-correcting codes for reliable communication and data storage.
  • C. asymmetric cryptographic algorithm
    An asymmetric cryptographic algorithm is a method that uses a mathematically related pair of keys—one public and one private—to enable secure operations such as encryption, decryption, and digital signatures without sharing secret keys.
  • D. corrections administrator
    A corrections administrator is a professional responsible for overseeing the operations, policies, staff, and resources of correctional facilities or systems to ensure security, compliance, and effective rehabilitation of offenders.
  • E. coded message
    A coded message is information that has been transformed using a specific system or key so that its meaning is concealed from anyone who does not know how to decode it.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847e53a88190a60eed7e02257f10 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 8:03 p.m.