Triple

T9545618
Position Surface form Disambiguated ID Type / Status
Subject Hau River E230274 entity
Predicate hasBridge P386 FINISHED
Object Can Tho Bridge E149153 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Can Tho Bridge | Statement: [Hau River, hasBridge, Can Tho Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Can Tho Bridge
Context triple: [Hau River, hasBridge, Can Tho Bridge]
  • A. Can Tho Bridge chosen
    Can Tho Bridge is a major cable-stayed bridge in southern Vietnam that spans the Hau River, significantly improving transportation links in the Mekong Delta region.
  • B. Long Bien Bridge
    Long Bien Bridge is a historic cantilever bridge in Hanoi, Vietnam, famed for its French colonial-era construction and its resilience through multiple wars.
  • C. Tran Thi Ly Bridge
    Tran Thi Ly Bridge is a modern, cable-stayed bridge in Da Nang, Vietnam, known for its distinctive leaning pylon and striking nighttime illumination.
  • D. Hiền Lương Bridge
    Hiền Lương Bridge is a historic bridge over the Bến Hải River in central Vietnam, famously known for marking the division between North and South Vietnam during the Vietnam War.
  • E. Thu Thiem Bridge
    Thu Thiem Bridge is a major road bridge in Ho Chi Minh City, Vietnam, connecting the city center with the Thu Thiem urban area in District 2.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847c70b8819088a0a0bad64a50d6 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9901f2bc8190a4076f5947660df9 completed April 1, 2026, 10:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69d14c747e608190b2fa470324fff454 completed April 4, 2026, 5:37 p.m.
Created at: March 30, 2026, 8:01 p.m.