Triple

T9543939
Position Surface form Disambiguated ID Type / Status
Subject Vestas V80 E230232 entity
Predicate category P87 FINISHED
Object Vestas wind turbines E455780 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vestas wind turbines | Statement: [Vestas V80, category, Vestas wind turbines]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vestas wind turbines
Context triple: [Vestas V80, category, Vestas wind turbines]
  • A. Vestas V80
    The Vestas V80 is a widely used 2 MW-class onshore and offshore wind turbine model developed by Danish manufacturer Vestas for commercial-scale wind power generation.
  • B. Vestas Wind Systems chosen
    Vestas Wind Systems is a Danish multinational company and one of the world’s leading manufacturers and service providers of wind turbines and renewable energy solutions.
  • C. Vestas V90-3.0 MW
    The Vestas V90-3.0 MW is a widely used 3-megawatt offshore and onshore wind turbine model designed for high efficiency and reliability in large-scale wind power projects.
  • D. Siemens Wind Power
    Siemens Wind Power is a division of Siemens that designs, manufactures, and services onshore and offshore wind turbines for renewable energy generation worldwide.
  • E. Siemens SWT-2.3-93
    The Siemens SWT-2.3-93 is a 2.3-megawatt onshore wind turbine model widely used in utility-scale wind farms for electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847c70b8819088a0a0bad64a50d6 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd98ebd4148190b71b134d7545fe35 completed April 1, 2026, 10:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69d14c6cd93c8190ac197afda780ce78 completed April 4, 2026, 5:37 p.m.
Created at: March 30, 2026, 8:01 p.m.