Triple

T9525738
Position Surface form Disambiguated ID Type / Status
Subject Dambusters Raid sites E229755 entity
Predicate instanceOf P0 FINISHED
Object military target set C340 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military target set
Context triple: [Dambusters Raid sites, instanceOf, military target set]
  • A. military mission
    A military mission is a coordinated operation undertaken by armed forces to achieve specific strategic, operational, or tactical objectives within defined constraints and rules of engagement.
  • B. terrorist attack target
    A terrorist attack target is any person, place, system, or symbolic asset deliberately selected by terrorists to inflict harm, create fear, or achieve political, ideological, or religious objectives.
  • C. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • D. target ship
    A target ship is a vessel, often obsolete or specially constructed, used as a practice target for testing and training with naval weapons and tactics.
  • E. military operation chosen
    A military operation is a coordinated and planned set of actions conducted by armed forces to achieve specific strategic, operational, or tactical objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847870a881909d8d751a7d29da39 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 7:59 p.m.