Triple

T95236
Position Surface form Disambiguated ID Type / Status
Subject Linac4 E1915 entity
Predicate operationalStartDate P288 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [Linac4, operationalStartDate, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operationalStartDate
Context triple: [Linac4, operationalStartDate, 2020]
  • A. operatedAt
    Indicates that an operation, procedure, or activity was performed at a specific location or facility.
  • B. officialOpeningYear
    Indicates the calendar year in which something was formally opened or inaugurated for official use.
  • C. operatedDuring
    Indicates that an action, process, or system was functioning or in operation throughout a specified time period or event.
  • D. launchDate
    Indicates the date on which an entity (such as a product, service, or project) is officially released or made available.
  • E. startDate chosen
    Indicates the point in time when an event, state, or relationship begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24d4862f881908cc8b89d3a78031d completed Feb. 28, 2026, 2:04 a.m.
NER Named-entity recognition batch_69a24feef1b08190bb9525f71cce053e completed Feb. 28, 2026, 2:16 a.m.
PD Predicate disambiguation batch_69a24ebb3da08190a8b82564f33cde3b completed Feb. 28, 2026, 2:11 a.m.
Created at: Feb. 28, 2026, 2:09 a.m.