Triple

T95218
Position Surface form Disambiguated ID Type / Status
Subject Linac4 E1915 entity
Predicate instanceOf P0 FINISHED
Object CERN accelerator complex component C1695 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CERN accelerator complex component
Context triple: [Linac4, instanceOf, CERN accelerator complex component]
  • A. research facility
    A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
  • B. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. global computer network
    A global computer network is a worldwide system of interconnected computers and devices that communicate using standardized protocols to share data and resources across vast distances.
  • D. analog computer
    An analog computer is a computing device that represents and processes data as continuously variable physical quantities, such as voltages or mechanical motions, to model and solve mathematical problems.
  • E. astronomical observatory
    An astronomical observatory is a facility equipped with specialized instruments and structures designed to observe, record, and analyze celestial objects and phenomena.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24d4862f881908cc8b89d3a78031d completed Feb. 28, 2026, 2:04 a.m.
Created at: Feb. 28, 2026, 2:09 a.m.