Triple

T9520010
Position Surface form Disambiguated ID Type / Status
Subject Paul McCartney discography E229620 entity
Predicate notableWork P4 FINISHED
Object Egypt Station E43667 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Egypt Station | Statement: [Paul McCartney discography, notableWork, Egypt Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Egypt Station
Context triple: [Paul McCartney discography, notableWork, Egypt Station]
  • A. Egypt Station chosen
    Egypt Station is a 2018 studio album by Paul McCartney that blends rock, pop, and reflective songwriting in his late-career discography.
  • B. Ramses Station, Cairo
    Ramses Station in Cairo is Egypt’s main central railway terminus and a historic transportation landmark connecting the capital with major cities across the country.
  • C. Tura, Egypt
    Tura, Egypt is an ancient quarrying area near Cairo renowned for producing the fine white limestone used in many of Egypt’s most important pyramids and temples.
  • D. Xois, Egypt
    Xois, Egypt was an ancient city in the Nile Delta that served as the capital of the 14th Dynasty during Egypt’s Second Intermediate Period.
  • E. Alexandria Misr Station
    Alexandria Misr Station is a major railway station in Alexandria, Egypt, serving as a key passenger and transport hub within the national rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca847870a881909d8d751a7d29da39 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cd9883c5c48190a6583921afe9730a completed April 1, 2026, 10:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69d2b58f7ea08190a96d88bafe9d4308 completed April 5, 2026, 7:18 p.m.
Created at: March 30, 2026, 7:59 p.m.