Triple

T9512471
Position Surface form Disambiguated ID Type / Status
Subject Marvel Cinematic Universe Phase Four E229434 entity
Predicate instanceOf P0 FINISHED
Object film and television production phase C26379 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film and television production phase
Context triple: [Marvel Cinematic Universe Phase Four, instanceOf, film and television production phase]
  • A. film phase
    A film phase is a distinct stage in the lifecycle of a film project, such as development, pre-production, production, post-production, or distribution, characterized by specific goals, tasks, and deliverables.
  • B. post-production process
    The post-production process is the stage in media creation where recorded material is edited, enhanced, and finalized through tasks such as cutting, sound design, visual effects, color correction, and mastering before distribution.
  • C. production studio
    A production studio is a facility equipped with the space, technology, and personnel needed to plan, create, and finalize audio, video, or multimedia content.
  • D. film sound stage
    A film sound stage is a large, acoustically controlled studio space designed for constructing sets and recording synchronized picture and sound for film and television productions.
  • E. television production centre
    A television production centre is a facility equipped with studios, control rooms, and technical infrastructure where television programs are planned, recorded, edited, and broadcast.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84777560819084cddd999badc1aa completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 7:58 p.m.