Triple
T949755
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Interstate 70 |
E20492
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object |
Interstate 76
Interstate 76 is a major east–west U.S. highway composed of two separate segments in Colorado–Nebraska and Pennsylvania–New Jersey, serving as a key route through the central and northeastern United States.
|
E447583
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 76 | Statement: [Interstate 70, connectsTo, Interstate 76]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 76 Context triple: [Interstate 70, connectsTo, Interstate 76]
-
A.
Interstate 376
Interstate 376 is a major highway in western Pennsylvania that connects the Pittsburgh metropolitan area with surrounding regions, including Beaver County and the Pennsylvania Turnpike.
-
B.
Interstate 610
Interstate 610 is a beltway freeway encircling central Houston, Texas, serving as a major loop that connects multiple radial highways and facilitates regional traffic flow.
-
C.
Interstate 79
Interstate 79 is a major north–south U.S. highway running through the Appalachian region, primarily serving Pennsylvania and West Virginia.
-
D.
Interstate 81
Interstate 81 is a major north–south U.S. highway running primarily through the Appalachian region from Tennessee to the Canadian border in New York, serving as a key freight and travel corridor.
-
E.
Interstate 75
Interstate 75 is a major north–south U.S. Interstate Highway running from southern Florida through several states in the Midwest to the Canadian border in Michigan.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 76 Triple: [Interstate 70, connectsTo, Interstate 76]
Generated description
Interstate 76 is a major east–west U.S. highway composed of two separate segments in Colorado–Nebraska and Pennsylvania–New Jersey, serving as a key route through the central and northeastern United States.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Interstate 76 Target entity description: Interstate 76 is a major east–west U.S. highway composed of two separate segments in Colorado–Nebraska and Pennsylvania–New Jersey, serving as a key route through the central and northeastern United States.
-
A.
Interstate 376
Interstate 376 is a major highway in western Pennsylvania that connects the Pittsburgh metropolitan area with surrounding regions, including Beaver County and the Pennsylvania Turnpike.
-
B.
Interstate 610
Interstate 610 is a beltway freeway encircling central Houston, Texas, serving as a major loop that connects multiple radial highways and facilitates regional traffic flow.
-
C.
Interstate 79
Interstate 79 is a major north–south U.S. highway running through the Appalachian region, primarily serving Pennsylvania and West Virginia.
-
D.
Interstate 81
Interstate 81 is a major north–south U.S. highway running primarily through the Appalachian region from Tennessee to the Canadian border in New York, serving as a key freight and travel corridor.
-
E.
Interstate 75
Interstate 75 is a major north–south U.S. Interstate Highway running from southern Florida through several states in the Midwest to the Canadian border in Michigan.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493b0f2fc81908cd227480a5356a1 |
completed | March 1, 2026, 7:29 p.m. |
| NER | Named-entity recognition | batch_69a4b3c191ac819099ebf3cb32f096d8 |
completed | March 1, 2026, 9:46 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69bd6f6fe04c8190bffabb9225ef6c2a |
completed | March 20, 2026, 4:01 p.m. |
| NEDg | Description generation | batch_69bd7275bf8081908558a5619fc78766 |
completed | March 20, 2026, 4:14 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69bd744b79548190a117105f47a4e51a |
completed | March 20, 2026, 4:22 p.m. |
Created at: March 1, 2026, 7:40 p.m.