Triple
T9496930
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yangpu Riverside public space |
E229031
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | revitalized industrial waterfront |
C1079
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: revitalized industrial waterfront Context triple: [Yangpu Riverside public space, instanceOf, revitalized industrial waterfront]
-
A.
waterfront district
chosen
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
B.
coastal industrial area
A coastal industrial area is a shoreline zone dominated by factories, ports, warehouses, and related infrastructure that support manufacturing, shipping, and other large-scale economic activities.
-
C.
industrial district
An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
-
D.
former industrial plant
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
E.
waterfront revitalization plan
A waterfront revitalization plan is a comprehensive strategy to transform underused or deteriorated shoreline areas into vibrant, accessible, and sustainable public and economic spaces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84753660819098e8d416e89e26ae |
completed | March 30, 2026, 2:11 p.m. |
Created at: March 30, 2026, 7:56 p.m.