Triple

T9380848
Position Surface form Disambiguated ID Type / Status
Subject OVO Energy E225777 entity
Predicate instanceOf P0 FINISHED
Object energy supplier C26050 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: energy supplier
Context triple: [OVO Energy, instanceOf, energy supplier]
  • A. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • B. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • C. wholesale energy company
    A wholesale energy company is a business that buys large quantities of electricity or fuel from producers and sells them in bulk to utilities, large industrial customers, or other resellers, often managing supply, pricing, and risk in energy markets.
  • D. integrated energy company
    An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
  • E. energy hub
    An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca842e9dcc8190a264119e683cfe04 completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:44 p.m.