Triple

T931925
Position Surface form Disambiguated ID Type / Status
Subject Omagh bombing E20110 entity
Predicate warningCalls P20086 FINISHED
Object multiple telephone warnings made before the explosion LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: multiple telephone warnings made before the explosion | Statement: [Omagh bombing, warningCalls, multiple telephone warnings made before the explosion]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: warningCalls
Context triple: [Omagh bombing, warningCalls, multiple telephone warnings made before the explosion]
  • A. warnsAbout
    Indicates that one entity alerts or cautions another entity about a potential danger, risk, or problem.
  • B. alertMethod
    Indicates the method or channel through which an alert or notification is delivered from a source to a recipient.
  • C. warnedWith chosen
    Indicates that one entity issued a warning to another entity using or accompanied by a particular medium, content, or instrument.
  • D. raisedConcernAbout
    Indicates that one entity has expressed worry, doubt, or objection regarding another entity or issue.
  • E. mayReportTo
    Indicates that one entity is permitted or allowed to have a reporting relationship to another entity, such as an employee being allowed to report to a particular manager.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493af3dc48190adb7263e6e445ea1 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b3bcad2481908b83575b2fb80d14 completed March 1, 2026, 9:46 p.m.
PD Predicate disambiguation batch_69a4b299c4d881908a57ac2711676cd7 completed March 1, 2026, 9:41 p.m.
Created at: March 1, 2026, 7:40 p.m.