Triple
T9260256
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Department of Physics, University of Illinois at Urbana–Champaign |
E222556
|
entity |
| Predicate | hasBuilding |
P105
|
FINISHED |
| Object |
Materials Research Laboratory building
The Materials Research Laboratory building is a major interdisciplinary research facility at the University of Illinois at Urbana–Champaign that supports advanced studies in materials science, physics, and related fields.
|
E787809
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Materials Research Laboratory building | Statement: [Department of Physics, University of Illinois at Urbana–Champaign, hasBuilding, Materials Research Laboratory building]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Materials Research Laboratory building Context triple: [Department of Physics, University of Illinois at Urbana–Champaign, hasBuilding, Materials Research Laboratory building]
-
A.
Main Laboratory Building
The Main Laboratory Building is the central historic research and development facility where Thomas Edison conducted many of his most significant experiments and inventions.
-
B.
Energy Sciences Building
The Energy Sciences Building is a state-of-the-art research facility at Argonne National Laboratory dedicated to advanced studies in materials, chemistry, and energy technologies.
-
C.
Materials Science Laboratory-2
Materials Science Laboratory-2 was a Space Shuttle materials research facility designed to conduct experiments on the behavior and processing of materials in microgravity.
-
D.
Fiber Optics Materials Research Building
The Fiber Optics Materials Research Building is a specialized research facility focused on the study and development of fiber-optic materials and technologies.
-
E.
Materials Engineering Research Facility
The Materials Engineering Research Facility is a specialized Argonne National Laboratory center focused on developing, scaling, and translating advanced materials and manufacturing processes for scientific and industrial applications.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Materials Research Laboratory building Triple: [Department of Physics, University of Illinois at Urbana–Champaign, hasBuilding, Materials Research Laboratory building]
Generated description
The Materials Research Laboratory building is a major interdisciplinary research facility at the University of Illinois at Urbana–Champaign that supports advanced studies in materials science, physics, and related fields.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Materials Research Laboratory building Target entity description: The Materials Research Laboratory building is a major interdisciplinary research facility at the University of Illinois at Urbana–Champaign that supports advanced studies in materials science, physics, and related fields.
-
A.
Main Laboratory Building
The Main Laboratory Building is the central historic research and development facility where Thomas Edison conducted many of his most significant experiments and inventions.
-
B.
Energy Sciences Building
The Energy Sciences Building is a state-of-the-art research facility at Argonne National Laboratory dedicated to advanced studies in materials, chemistry, and energy technologies.
-
C.
Materials Science Laboratory-2
Materials Science Laboratory-2 was a Space Shuttle materials research facility designed to conduct experiments on the behavior and processing of materials in microgravity.
-
D.
Fiber Optics Materials Research Building
The Fiber Optics Materials Research Building is a specialized research facility focused on the study and development of fiber-optic materials and technologies.
-
E.
Materials Engineering Research Facility
The Materials Engineering Research Facility is a specialized Argonne National Laboratory center focused on developing, scaling, and translating advanced materials and manufacturing processes for scientific and industrial applications.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca841e4cd481908e738c74e958eaea |
completed | March 30, 2026, 2:09 p.m. |
| NER | Named-entity recognition | batch_69cd07160e408190be4bd7b757260a0e |
completed | April 1, 2026, 11:52 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d09bfb7dfc8190bc337a54083e0dd9 |
completed | April 4, 2026, 5:04 a.m. |
| NEDg | Description generation | batch_69d09cc5cdd481908903ae0e49c1085d |
completed | April 4, 2026, 5:08 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d09d7364b48190ad3dd55711bd2534 |
completed | April 4, 2026, 5:11 a.m. |
Created at: March 30, 2026, 7:32 p.m.