Triple

T9250185
Position Surface form Disambiguated ID Type / Status
Subject Saigon Bridge E222301 entity
Predicate partOf P40 FINISHED
Object National Route 1A E248401 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Route 1A | Statement: [Saigon Bridge, partOf, National Route 1A]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: National Route 1A
Context triple: [Saigon Bridge, partOf, National Route 1A]
  • A. National Route 1A chosen
    National Route 1A is Vietnam’s primary north–south highway, running the length of the country and connecting major cities, provinces, and economic regions.
  • B. National Route 10
    National Route 10 is a major Vietnamese highway that runs through the Red River Delta, linking key northern coastal provinces and cities, including Nam Dinh.
  • C. National Route 1
    National Route 1 is a major Japanese highway that links Tokyo with Osaka, passing through key urban and industrial areas along the Pacific coast of Honshu.
  • D. National Route 13
    National Route 13 is a major highway in southern Vietnam that connects Ho Chi Minh City with several provinces to the north and serves as an important trade and transport corridor.
  • E. National Route 17
    National Route 17 is a major South Korean highway that runs north–south across the country, connecting multiple cities and regions including Eumseong County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841d2b18819089f9faf5b2c2aec0 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd05f7e9848190939f9199d0c1a572 completed April 1, 2026, 11:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69d077fed7888190a5d36bc2ee4c2bd2 completed April 4, 2026, 2:31 a.m.
Created at: March 30, 2026, 7:31 p.m.