Subject IEC 60870‑5‑101 E222300 entity
Predicate partOf P40 FINISHED
Object IEC 60870‑5 series E481591 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC 60870‑5 series | Statement: [IEC 60870‑5‑101, partOf, IEC 60870‑5 series]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC 60870‑5 series
Context triple: [IEC 60870‑5‑101, partOf, IEC 60870‑5 series]
  • A. IEC 60870 chosen
    IEC 60870 is an international standard defining protocols for telecontrol and supervisory control and data acquisition (SCADA) systems in electrical power and industrial automation.
  • B. IEC 60870‑5‑101
    IEC 60870‑5‑101 is an international standard defining basic telecontrol communication protocols for monitoring and controlling electrical power systems over serial links.
  • C. IEC 60870‑5‑104
    IEC 60870‑5‑104 is an international standard defining networked telecontrol communication protocols for supervisory control and data acquisition (SCADA) systems over TCP/IP in electrical power systems.
  • D. IEC 61850
    IEC 61850 is an international standard that defines communication protocols and data models for automation, protection, and control systems in electrical substations and power utility networks.
  • E. IEC 61970
    IEC 61970 is an international standard that defines a common information model and interfaces for energy management system application programming interfaces in electric power systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841d2b18819089f9faf5b2c2aec0 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd05f7e9848190939f9199d0c1a572 completed April 1, 2026, 11:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69d077fed7888190a5d36bc2ee4c2bd2 completed April 4, 2026, 2:31 a.m.