Triple
T9104635
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Don River and Central Waterfront Project |
E218445
|
entity |
| Predicate | typeOfFloodProtection |
P25048
|
FINISHED |
| Object | riverine flood protection |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: riverine flood protection | Statement: [Don River and Central Waterfront Project, typeOfFloodProtection, riverine flood protection]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: typeOfFloodProtection Context triple: [Don River and Central Waterfront Project, typeOfFloodProtection, riverine flood protection]
-
A.
floodResistanceDesign
Indicates that something is designed or engineered to withstand, mitigate, or remain functional during flooding conditions.
-
B.
floodResistanceImproved
Indicates that an entity’s ability to withstand or cope with flooding has been enhanced.
-
C.
hasFloodProtectionInfrastructure
chosen
Indicates that there exists built or implemented infrastructure designed to protect against or mitigate flooding for the referenced entity.
-
D.
typeOfDam
Indicates the specific kind or classification of a dam associated with an entity.
-
E.
typeOfDamProject
Indicates that a given project is classified as a dam-related project (i.e., it is a project whose type is a dam project).
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83db7448819090d0a5de842ef2ac |
completed | March 30, 2026, 2:08 p.m. |
| NER | Named-entity recognition | batch_69cca5714d048190a633caaaa707ac3b |
completed | April 1, 2026, 4:56 a.m. |
| PD | Predicate disambiguation | batch_69cc65fc7f408190a5846e29ab3b97e5 |
completed | April 1, 2026, 12:25 a.m. |
Created at: March 30, 2026, 7:15 p.m.