Triple

T9050040
Position Surface form Disambiguated ID Type / Status
Subject Ben Cat River E216858 entity
Predicate partOf P40 FINISHED
Object Saigon River basin E41500 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Saigon River basin | Statement: [Ben Cat River, partOf, Saigon River basin]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Saigon River basin
Context triple: [Ben Cat River, partOf, Saigon River basin]
  • A. Saigon River chosen
    The Saigon River is a major waterway in southern Vietnam that flows through Ho Chi Minh City and serves as an important route for transport, trade, and urban life.
  • B. Mekong Delta
    The Mekong Delta is a vast, fertile river delta region in southern Vietnam known for its intricate network of waterways, rice paddies, and floating markets.
  • C. Dong Nai River
    The Đồng Nai River is a major river in southern Vietnam that flows through several provinces and plays a crucial role in the region’s ecology, agriculture, and hydropower production.
  • D. Tam Diep
    Tam Diep is a town in northern Vietnam known for its location in Ninh Binh Province and its role as a local administrative and commercial center.
  • E. Namoi River catchment
    The Namoi River catchment is a major river basin in northern New South Wales, Australia, encompassing agricultural lands and tributaries that drain into the Namoi River before joining the Barwon–Darling river system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d362e88190ae44b4e4dc194209 completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69cc6b52cc1881909fb011d9a8af2e18 completed April 1, 2026, 12:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0b1877fd48190ad33df32bcd93e13 completed April 4, 2026, 6:36 a.m.
Created at: March 30, 2026, 7:10 p.m.