Triple

T9047939
Position Surface form Disambiguated ID Type / Status
Subject Huntingdon to Cambridge section E216804 entity
Predicate hasJunctionWith P1018 FINISHED
Object A1
A1 is a major north–south trunk road in England that forms part of the primary route between London and Edinburgh.
E774445 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A1 | Statement: [Huntingdon to Cambridge section, hasJunctionWith, A1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A1
Context triple: [Huntingdon to Cambridge section, hasJunctionWith, A1]
  • A. A1
    A1 is the designation of Switzerland’s primary east–west motorway, connecting major cities such as Geneva, Bern, Zurich, and St. Gallen.
  • B. A1
    A1 is the primary north–south route along Australia’s east coast, forming part of the country’s National Highway network and linking major coastal cities and regions.
  • C. A10
    A10 is a major orbital motorway encircling Amsterdam in the Netherlands, connecting various national highways and providing primary access to the city.
  • D. A10
    A10 is the route designation for a major German autobahn that forms the orbital Berliner Ring encircling the city of Berlin.
  • E. A10
    The A10 is a major road in England that runs from London northwards through Hertfordshire and Cambridgeshire, forming a key route between the capital and East Anglia.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A1
Triple: [Huntingdon to Cambridge section, hasJunctionWith, A1]
Generated description
A1 is a major north–south trunk road in England that forms part of the primary route between London and Edinburgh.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A1
Target entity description: A1 is a major north–south trunk road in England that forms part of the primary route between London and Edinburgh.
  • A. A1
    A1 is the designation of Switzerland’s primary east–west motorway, connecting major cities such as Geneva, Bern, Zurich, and St. Gallen.
  • B. A1
    A1 is the primary north–south route along Australia’s east coast, forming part of the country’s National Highway network and linking major coastal cities and regions.
  • C. A10
    A10 is a major orbital motorway encircling Amsterdam in the Netherlands, connecting various national highways and providing primary access to the city.
  • D. A10
    A10 is the route designation for a major German autobahn that forms the orbital Berliner Ring encircling the city of Berlin.
  • E. A10
    The A10 is a major road in England that runs from London northwards through Hertfordshire and Cambridgeshire, forming a key route between the capital and East Anglia.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d362e88190ae44b4e4dc194209 completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69cc6b5022c88190ab6b6de3c3830a41 completed April 1, 2026, 12:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfebc0fd648190b0dd6cf62605b98f completed April 3, 2026, 4:33 p.m.
NEDg Description generation batch_69cfed4fb6cc8190bb97345dd392b25b completed April 3, 2026, 4:39 p.m.
NED2 Entity disambiguation (via description) batch_69cfedf299908190852cc627fd7134b9 completed April 3, 2026, 4:42 p.m.
Created at: March 30, 2026, 7:09 p.m.