Triple

T9011620
Position Surface form Disambiguated ID Type / Status
Subject Glenfinnan Viaduct E215486 entity
Predicate connects P390 FINISHED
Object Mallaig E76807 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mallaig | Statement: [Glenfinnan Viaduct, connects, Mallaig]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mallaig
Context triple: [Glenfinnan Viaduct, connects, Mallaig]
  • A. Mallaig chosen
    Mallaig is a small fishing port and ferry terminal on the west coast of the Scottish Highlands, serving as a key gateway to the Inner Hebrides.
  • B. Airmagh
    Airmagh is the Ulster Scots name for the city of Armagh in Northern Ireland, known for its religious and historical significance.
  • C. Kilmallock
    Kilmallock is a historic market town in County Limerick, Ireland, known for its medieval walls, ecclesiastical ruins, and significant role in Irish history.
  • D. Ballygrant
    Ballygrant is a small rural village on the Scottish island of Islay, known for its traditional community and scenic Hebridean surroundings.
  • E. Glenarm
    Glenarm is a historic coastal village in County Antrim, Northern Ireland, known for Glenarm Castle, its scenic harbour, and its location along the Antrim Coast Road.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a2bf088190986ee7a8eb90407d completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc69f846f88190af65dfcf8bdd936a completed April 1, 2026, 12:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfdb9dca848190952427bb5712081f completed April 3, 2026, 3:24 p.m.
Created at: March 30, 2026, 7:06 p.m.