Triple

T8975370
Position Surface form Disambiguated ID Type / Status
Subject Évry-Courcouronnes E214372 entity
Predicate hasTransport P1298 FINISHED
Object RER D line E525567 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RER D line | Statement: [Évry-Courcouronnes, hasTransport, RER D line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RER D line
Context triple: [Évry-Courcouronnes, hasTransport, RER D line]
  • A. RER line D chosen
    RER line D is one of the main lines of the Paris RER suburban rail network, running north–south through central Paris and serving numerous suburbs across the Île-de-France region.
  • B. RER B line
    The RER B line is a major Paris regional express railway line that connects central Paris with key northern and southern suburbs, including Charles de Gaulle Airport.
  • C. RER line E
    RER line E is a Paris regional express railway line connecting central Paris with eastern suburbs such as Gagny.
  • D. RER Line C
    RER Line C is a major commuter rail line in the Paris RER network, running along the Seine and serving numerous suburbs and key destinations in the Île-de-France region.
  • E. RER Vaud
    RER Vaud is a regional express rail network in the canton of Vaud, Switzerland, providing frequent commuter and regional train services connecting local towns and cities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839dbf608190a2f5990477115d29 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc6784d1808190899c980f76084ff8 completed April 1, 2026, 12:32 a.m.
NED1 Entity disambiguation (via context triple) batch_69d065b8e9fc8190b1eff91f2048e771 completed April 4, 2026, 1:13 a.m.
Created at: March 30, 2026, 7:02 p.m.