Triple

T895396
Position Surface form Disambiguated ID Type / Status
Subject Payne Whitney Gymnasium E19332 entity
Predicate instanceOf P0 FINISHED
Object gymnasium C239 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: gymnasium
Context triple: [Payne Whitney Gymnasium, instanceOf, gymnasium]
  • A. laboratory school
    A laboratory school is an educational institution, often affiliated with a university, that serves as a site for teacher training, educational research, and the development and testing of innovative teaching methods and curricula.
  • B. sports and recreation facility
    A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
  • C. indoor athletic facility chosen
    An indoor athletic facility is a covered, climate-controlled space equipped with specialized areas and equipment designed to support a variety of sports, fitness activities, and physical training programs year-round.
  • D. public school
    A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
  • E. day school
    A day school is an educational institution where students attend classes during the day and return home afterward, without residing on campus.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4939d37188190848be3d426ebc9ae completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:39 p.m.