Triple

T8951903
Position Surface form Disambiguated ID Type / Status
Subject Brownlee Dam E213371 entity
Predicate partOf P40 FINISHED
Object Hells Canyon Project
The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
E768655 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hells Canyon Project | Statement: [Brownlee Dam, partOf, Hells Canyon Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hells Canyon Project
Context triple: [Brownlee Dam, partOf, Hells Canyon Project]
  • A. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • B. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • C. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • D. Upper Snake River Project
    The Upper Snake River Project is a U.S. Bureau of Reclamation water management and irrigation system in the upper Snake River Basin that includes multiple dams, reservoirs, and related infrastructure for flood control, power generation, and agricultural use.
  • E. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Hells Canyon Project
Triple: [Brownlee Dam, partOf, Hells Canyon Project]
Generated description
The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Hells Canyon Project
Target entity description: The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
  • A. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • B. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • C. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • D. Upper Snake River Project
    The Upper Snake River Project is a U.S. Bureau of Reclamation water management and irrigation system in the upper Snake River Basin that includes multiple dams, reservoirs, and related infrastructure for flood control, power generation, and agricultural use.
  • E. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839843408190a39069a029a89f15 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc670dc0c88190b1f59e96ad88e4ee completed April 1, 2026, 12:30 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfc20a5ab481909e10f3abf679ec4c completed April 3, 2026, 1:35 p.m.
NEDg Description generation batch_69cfc2d295c48190952486e6f44cd74f completed April 3, 2026, 1:38 p.m.
NED2 Entity disambiguation (via description) batch_69cfc722921881908978147e4cc6875c completed April 3, 2026, 1:56 p.m.
Created at: March 30, 2026, 6:59 p.m.