Triple

T8942977
Position Surface form Disambiguated ID Type / Status
Subject Cao Kun E212948 entity
Predicate instanceOf P0 FINISHED
Object Beiyang clique warlord C25358 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Beiyang clique warlord
Context triple: [Cao Kun, instanceOf, Beiyang clique warlord]
  • A. Zhili clique leader
    A Zhili clique leader is a high-ranking military or political figure who commands and directs the factional interests, strategies, and operations of the Zhili clique within the broader context of early 20th-century Chinese warlord politics.
  • B. Nationalist Chinese military leader
    A Nationalist Chinese military leader is a high-ranking officer or commander who served under the Republic of China’s Nationalist government, directing armed forces in defense of its political authority and territorial claims, often in opposition to Communist forces and foreign invaders.
  • C. Southern Ming emperor
    A Southern Ming emperor is a ruler of the Ming loyalist regimes that continued to claim the Chinese throne in southern China after the Ming dynasty’s fall to the Qing in 1644.
  • D. Manchukuo emperor
    A Manchukuo emperor is the sovereign ruler and symbolic head of state of the Japanese-established puppet kingdom of Manchukuo (1932–1945), most notably embodied by Puyi, the last Qing emperor.
  • E. Chinese admiral
    A Chinese admiral is a high-ranking naval officer of China responsible for commanding fleets, directing maritime strategy, and overseeing naval operations and defense.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839694c88190b324ffeb43d23b08 completed March 30, 2026, 2:07 p.m.
Created at: March 30, 2026, 6:58 p.m.