Triple

T8942115
Position Surface form Disambiguated ID Type / Status
Subject InterCity East Coast E212927 entity
Predicate instanceOf P0 FINISHED
Object British Rail sector brand C19102 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: British Rail sector brand
Context triple: [InterCity East Coast, instanceOf, British Rail sector brand]
  • A. former British Rail sector chosen
    A former British Rail sector is an organizational division that once managed specific types of rail services or geographic areas within the state-owned British Rail system before its restructuring and privatization.
  • B. region of British Railways
    A region of British Railways is a large administrative and operational division of the national rail network, responsible for managing railway services, infrastructure, and staff within a defined geographic area of Great Britain.
  • C. former British rail franchise operator
    A former British rail franchise operator is a company that previously held a government-awarded contract to run passenger train services on specific routes or regions within the UK rail network.
  • D. British Railways policy document
    A British Railways policy document is an official written directive issued by British Railways that defines rules, procedures, and standards governing its operations, staff conduct, and strategic decisions.
  • E. high-speed rail service brand
    A high-speed rail service brand is a distinct identity and marketing concept that represents a specific provider’s fast, long-distance passenger train services, encompassing its name, visual design, service standards, and customer experience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839694c88190b324ffeb43d23b08 completed March 30, 2026, 2:07 p.m.
Created at: March 30, 2026, 6:58 p.m.